Last week we were analysing the fact that due to the current crisis the housing market has stalled, but instead the reforms sector of the industry has revitalized.
It is advisable to require any bids in writing, and the bid should be as explicit as possible with regards to quantity, quality and price and should include a description of materials and amount of labour to be used. As an example of what we are saying see below a description of a simple window replacement and its translation into English.
Cambio de ventana en Fachada |
|
1.1 |
DFC010 |
Ud |
Demolición de carpintería acristalada de aluminio de cualquier tipo situada en fachada, de menos de 3 m² de superficie, con medios manuales, y carga manual de escombros sobre camión o contenedor. |
|||||||||||
|
|
Uds. |
Largo |
Ancho |
Alto |
Parcial |
Subtotal |
|||||||
|
Ventana en fachada |
1 |
|
|
|
1,000 |
|
|||||||
|
|
|
|
|
|
1,000 |
1,000 |
|||||||
Total Ud : |
1,000 |
10,58 € |
10,58 € |
|||||||||||
Parcial nº 1 Demoliciones : |
10,58 € |
|||||||||||||
|
|
|
|
|||||||||||
2.1 |
FCL060 |
Ud |
Carpintería de aluminio, lacado estándar, para conformado de ventana de aluminio, abisagrada practicable de apertura hacia el interior, de 150x120 cm, serie alta, formada por dos hojas, con perfilería provista de rotura de puente térmico, y con premarco. Compacto térmico incorporado (monoblock), persiana de lamas de PVC, con accionamiento manual mediante cinta y recogedor. |
|||||||||||
|
|
Uds. |
Largo |
Ancho |
Alto |
Parcial |
Subtotal |
|||||||
|
Ventana en fachada tipo V1 |
1 |
|
|
|
1,000 |
|
|||||||
|
|
|
|
|
|
1,000 |
1,000 |
|||||||
Total Ud : |
1,000 |
591,08 € |
591,08 € |
|||||||||||
2.2 |
FVC010 |
M² |
Doble acristalamiento estándar, 4/6/4, con calzos y sellado continuo. |
|||||||||||
|
|
Uds. |
Largo |
Ancho |
Alto |
Parcial |
Subtotal |
|||||||
|
Vidrio en ventana tipo V1 |
1 |
1,500 |
|
1,200 |
1,800 |
|
|||||||
|
|
|
|
|
|
1,800 |
1,800 |
|||||||
Total m² : |
1,800 |
39,59 € |
71,26 € |
|||||||||||
Parcial nº 2 Carpintería exterior sotano. : |
662,34 € |
|||||||||||||
1 |
GRA010 |
Ud |
Transporte de residuos inertes de ladrillos, tejas y materiales cerámicos, producidos en obras de construcción y/o demolición, con contenedor de 1,5 m³, a vertedero específico, instalación de tratamiento de residuos de construcción y demolición externa a la obra o centro de valorización o eliminación de residuos. |
|||||||||||
|
|
Uds. |
Largo |
Ancho |
Alto |
Parcial |
Subtotal |
|||||||
|
Demoliciones |
1 |
|
|
|
1,000 |
|
|||||||
|
|
|
|
|
|
1,000 |
1,000 |
|||||||
Total Ud : |
1,000 |
59,92 € |
59,92 € |
|||||||||||
Parcial nº 3 Gestión de residuos : |
59,92 € |
|||||||||||||
Presupuesto de ejecución material |
|||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 Demoliciones |
10,58 € |
||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 Carpintería exterior sotano. |
662,34 € |
||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3 Gestión de residuos |
59,92 € |
||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total .........: |
732,84 € |
|||||||||||
Asciende el presupuesto de ejecución material a la expresada cantidad de SETECIENTOS TREINTA Y DOS EUROS CON OCHENTA Y CUATRO CÉNTIMOS.
|
Translation
Changing window in façade. |
|
||||||||||||||||||||||||||||
1.1 |
DFC010 |
Units. |
To demolish any type of existing aluminium joinery situated on the façade of less than 3m2 in area using manual means including loading all debris to lorry or container. |
|
|||||||||||||||||||||||||
|
|
Units. |
Length |
Width |
Height |
Partial |
Subtotal |
|
|||||||||||||||||||||
|
Window in façade |
1 |
|
|
|
1,000 |
|
|
|||||||||||||||||||||
|
|
|
|
|
|
1,000 |
1,000 |
|
|||||||||||||||||||||
Total Units : 1,000 |
|
|
10,58 € 10,58 € |
|
|||||||||||||||||||||||||
Partial nº 1 Demolitions : |
10,58 € |
|
|||||||||||||||||||||||||||
|
|
|
|
|
|||||||||||||||||||||||||
2.1 |
FCL060 |
Ud |
Standard joinery in lacquered aluminium, to be manufactured side hinged to be opened towards inside, series from 150x120 cm high, consisting of two leafs, joinery section provided with thermal break, including sub-frame. Built-in thermal Compact (mono-block), to include PVC slat shutter, activated manually using spooled tape. |
|
|||||||||||||||||||||||||
|
|
Units. |
Length |
Width |
Height |
Partial |
Subtotal |
|
|||||||||||||||||||||
|
Window in façade |
1 |
|
|
|
1,000 |
|
|
|||||||||||||||||||||
|
|
|
|
|
|
1,000 |
1,000 |
|
|||||||||||||||||||||
Total Units : |
1,000 |
591,08 € |
591,08 €
|
|
|||||||||||||||||||||||||
2.2 |
FVC010 |
M² |
Standard double glassing, 4/6/4 with shims and continuous sealing |
|
|||||||||||||||||||||||||
|
Units. |
Length |
Width |
Height |
Partial |
Subtotal |
|
||||||||||||||||||||||
|
Glass in window Window type V1 |
1 |
1,500 |
1,200 |
|
1,800 |
|
|
|||||||||||||||||||||
|
|
|
|
|
1,800 |
1,800 |
|
|
|||||||||||||||||||||
Total m² : |
1,800 |
39,59 € |
71,26 € |
|
|||||||||||||||||||||||||
Parcial nº 2 Joinery situated in basement. : |
662,34 € |
|
|||||||||||||||||||||||||||
1 |
GRA010 |
Ud |
Transportation of inert waste composed of: bricks, tiles and ceramics, from construction and / or demolition, within a 1.5 m³ container, to an authorised waste treatment deposit facility, independent from the construction or to a centre for recovery of waste disposal.
|
||||||||||||||||||||||||||||
|
|
Uds. |
Largo |
Ancho |
Alto |
Parcial |
Subtotal |
||||||||||||||||||||||||
|
Demoliciones |
1 |
|
|
|
1,000 |
|
||||||||||||||||||||||||
|
|
|
|
|
|
1,000 |
1,000 |
||||||||||||||||||||||||
Total Ud : |
1,000 |
59,92 € |
59,92 € |
||||||||||||||||||||||||||||
Partial nº 3 Waste management : |
59,92 € |
||||||||||||||||||||||||||||||
Implementation labour and material budget |
|||||||||||||||||||||||||||||||
1 Demolitions |
10,58 € |
||||||||||||||||||||||||||||||
2 External basement joinery. |
662,34 € |
||||||||||||||||||||||||||||||
3 Management of wastes |
59,92 € |
||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total .........: |
732,84 € |
|||||||||||
The budget to carry out the works including labour and material come to the amount of SEVEN HUNDRED THIRTY-TWO EUROS AND EIGHTY-FOUR CENTS. |
|||||||||||||||||||||||||||||||
Glossary
Accionamiento manual Activated manually
Acristalar Glazing
Aluminio Alumium
Calzos Shims
Camión Lorry
Carga Load
Carpintería de Aluminio Alumium joinery
Compacto térmico Thermal compact
Contenedor Container
Eliminación de residuos Waste treatment
Escombros Debries
Fachada Façade
Lacado Lacquered
Medios manuales Manual means
Persiana de lamas Slat shutter
Perfilería Joinery section
Premarco Sub-frame
Perfilería con rotura de puente térmico Joinery with thermal break
Serie alta Top serie
Superficie Area
Transporte de residuos Waste transport
Tratamiento de residuos Waste treatment
Vertedero Landfill
Vertido ilegal Fly-tipping- Ilegal dumping
Write a comment